.NET MINI PROJECTS .NET PROJECTS

PATIENT MANAGEMENT SYSTEM

Abstract:

In a given day, a number of patients visit a healing center or a facility. Numerous clinics in India still deal with the patient information physically.

Healing facilities will have the capacity to spare cash and time in the event that they have a decent programming program for dealing with patient’s information.

The thought is to create online patient administration programming that can be utilized to monitor the patients enrolling in a doctor’s facility or center.

Specialists and the rooms accessible in a healing facility can be overseen utilizing this framework.

Additionally, this framework should bolster getting to the past visit histories of any patient, scan for patients by name and so forth.

A couple of focuses to be noted about the framework we are creating here

• A patient can be arranged as “In persistent” or “Out Patient”. On the off chance that patient sort is “In Patient”, a bed will be allowed to the patient.

• A specialist will be relegated to every patient before the patient meets the specialist. Just a single specialist can be doled out to a patient at a given time.

• A patient can visit the healing center any number of times

The important roles associated with the system would be:

Administrator: Administrator will have finish control of the framework. She/he jars Add/Edit/Delete patients, Add/Edit/Delete Doctors, Add/Edit/Delete Beds, Search for patients, Assign patients to specialists.

Doctor: Doctor can get to a patient’s record and refresh his perceptions about the patient in that specific visit.

Reports: The accompanying reports can be created. You can actualize more reports which you think can be valuable.

• Utilization of specialists

• List of Patients analyzed by an infection

• List of patients who went to amid a given day and age

EXISTING SYSTEM:

 Cannot Upload and Download the most recent updates.

 No utilization of Web Services and Removing.

 Risk of blunder and of information when the task is being worked on.

 Less Security.

 No legitimate coordination between various Applications and Users.

 Fewer Users – Friendly.

PROPOSED SYSTEM:

The advancement of the new framework contains the accompanying exercises, which endeavor to robotize the whole procedure keeping in perspective of the database mix approach.

 User amicability is furnished in the application with different controls.

 The framework makes the general undertaking administration significantly simpler and adaptable.

 Readily transfer the most recent updates, enables the client to download the alarms by tapping the URL.

 There is no danger of information fumble at any level while the task improvement is under process.

 It furnishes abnormal state of security with various level of confirmation.

MODULES:

1. Administration

2. Employee

3. Doctor

4. Reports

5. Authentication

FEATURES:

Make an electronic Patient Management System (PMS) for a doctor’s facility with the accompanying highlights

• Registration – This element permits to include/alter/erase patients in the framework.

• Patient Management – Before we let a client to visit a specialist, we ought to group whether he is an intolerant or an outpatient. At that point fundamental indications ought to be caught and entered in the framework. Existing patients can be sought by name, affirmation date, understanding ID and so on.

• Patient Visit History – Previous visit histories of the patient can be gotten to

• Assign Doctor – Assign a patient to a specialist in view of the essential data of the patient’s issues. In view of the specialization and accessibility of the specialists, patients ought to be relegated.

• Doctor Management – Add/Edit/Delete the specialists working in the doctor’s facility.

• Bed/Room Management – The beds or rooms in a doctor’s facility can be overseen. Include/Edit/Update the rooms with points of interest. Check accessibility and relegate a space to in-patients.

• Doctors can refresh the patient’s record with their perceptions

Keywords:

• Generic Technology Keywords: Databases, User Interface, Programming

• Specific Technology Keywords: ASP.Net, C#.Net, MS SQL Server

• Project Type Keywords: Analysis, Design, Implementation, Testing

• SDLC Keywords: Presentation, Business, Data Access Layers

Environment:

• Servers:

• Operating System Server: – Microsoft Windows 2000 or Higher

• Data Base Server: Microsoft SQL Server 2000/2005

• Clients: Microsoft Internet Explorer,

• Tools: Microsoft Visual Studio.Net

• User Interface: ASP.NET with AJAX

• Code Behind: VC#.NET

Requirements:

• Hardware prerequisites:

Number Description

1 PC with 2 GB hard-circle and 256 MB RAM

• Software prerequisites:

Number Description

1 Windows 2000/XP/or Higher with MS-office

2. MS-SQL server2000/2005

3. MS-Visual Studio.Net 2005

4. MS-Internet Explorer

Manpower prerequisites:

3To 4 Developers can finish this in 3-4 months.

Milestones:

No. Milestone Name Milestone Description

Comments

1 Requirements Specification Complete particular of the framework including characterizing progressions constitutes this development. An archive itemizing the same ought to be composed and an introduction to that be made. Attempt ought to be made to include some more pertinent usefulness other than those that are recorded in this report.

2 Technology familiarization Understanding of the innovation expected to actualize the task. The introduction ought to be from the perspective of having the capacity to apply it to the venture, as opposed to from a hypothetical viewpoint.

3 Database creation A database of no less than 10 passages of clients with no less than 1 should application admin. It is essential to settle on the database at this stage itself so advancement and testing can continue with the genuine database itself.

4 High-level and Detailed Design Listing down every conceivable situation and after that surfacing with stream diagrams or pseudo code to deal with the scenario. The situations should guide the necessity determination

5 Development of front end functionalities. Execution of the fundamental screen giving the login, a screen that takes after the login giving different choices, screens for every one of the alternatives During this point of the reference period, it would be a smart thought for the group to begin dealing with a test-get ready for the whole framework. This test-plan can be refreshed as and when new situations ring a bell.

6 Integrating the front-end with the database The front-end created in the before the point of reference will now have the capacity to refresh the database. Different highlights ought to be utilitarian at this stage. So, the framework ought to be prepared for mix testing.

7 Integration Testing The framework ought to be completely tried by running all the experiments composed of the framework (from point of reference 5). Another 2 weeks ought to be there to deal with any issues found amid testing of the framework. From that point forward, the last demo can be orchestrated.

8 Final Review Issues found amid the past point of reference are settled and the framework is prepared for the last review. During the last survey of the venture, it ought to be watched that every one of the prerequisites indicated amid development number 1 are satisfied

The following steps will be helpful to start off the project:

• Study and be OK with innovations, for example, ASP.Net with C#, and SQL Server.

• Gather some learning of item orders and support before beginning the outline.

• Create a client database with various access levels.

• Start with making the login screen.

• Create menus for route and gathering the functionalities as sub menus.

• Create the assistance pages of the application as FAQ. This will helps the client.

Leave a Reply

Your email address will not be published. Required fields are marked *