.NET MINI PROJECTS .NET PROJECTS

ASP Project On Knowledge Management System

ASP Project On Knowledge Management

ABSTRACT:

Information Management (KM) alludes to a scope of practices utilized by associations to recognize, make, speak to, and disperse learning for reuse, mindfulness and learning over the association. Learning Management programs are ordinarily attached to authoritative targets and are expected to prompt the accomplishment of particular results, for example, shared insight, enhanced execution, upper hand, or larger amounts of advancement.

Here we are taking a gander at building up an online intranet learning administration framework that is of significance to either an association or an instructive establishment. The framework (KMS) is an Intranet based application that can be gotten to all through the establishment or a predefined gathering or division. This framework can be utilized as a learning/data administration framework for the foundation.

Understudies/Staff signing in ought to have the capacity to transfer any sort of instructive data. Understudies/staff signing in may likewise get to/look through any data set up by others. KMS ought to encourage information sharing from the grass root level like task groups to divisions to the whole school.

 FEATURES:

CLIENT

• A client ought to have the capacity to enlist giving essential data.

• Login to the framework and change the watchword (if required) subsequent to signing in.

• Post archives/data and alter/erase his commitments.

• Access/Search archives/data posted by others (just read get to).

• Rate the substance posted by others.

• Search data by various parameters – rating/catchphrases/importance/classification

ADMINISTRATOR

An administrator login ought to be available who can read and also delete any superfluous posts by the individuals

REPORTS

The accompanying reports can be produced. You can actualize more reports which you think can be helpful.

• List of individuals in the framework number quantity of commitments made by them.

• Number of Contributions by classification and sort.

Highlights:

• There ought to be all around characterized classes under which one can post data

• KMS should bolster posting data under these classes.

• KMS should bolster transferring of word/pdf/exceed expectations/ppt reports under the classifications

• There ought to be a Search include and the outcomes ought to be shown in an exceptionally compelling manner.

ACRONYMS:

• Generic Technology Keywords: Databases, User Interface, Programming

• Specific Technology Keywords: ASP.Net, C#.Net, MS SQL Server

• Project Type Keywords: Analysis, Design, Implementation, Testing

• SDLC Keywords: Presentation, Business, Data Access Layers

EXISTING SYSTEM:

 Cannot Upload and Download the most recent updates.

 No utilization of Web Services and Remoting.

 Risk of bungle and of information when the task is being worked on.

 Less Security.

 No appropriate coordination between various Applications and Users.

 Fewer Users – Friendly.

PROPOSED SYSTEM:

The improvement of the new framework contains the accompanying exercises, which endeavor to robotize the whole procedure keeping in perspective of the database reconciliation approach.

 User cordiality is given in the application different controls.

 The framework makes the general task administration significantly less demanding and adaptable.

 Readily transfer the most recent updates, a enables client to download the alarms by tapping the URL.

 There is no danger of information fumble at any level while the undertaking improvement is under process.

 It furnishes abnormal state of security with various level of validation.

Condition:

• Servers:

 Operating System Server: – Microsoft Windows 2000 or Higher

 Data Base Server: Microsoft SQL Server 2000/2005

• Clients: Microsoft Internet Explorer,

• Tools: Microsoft Visual Studio .Net

• User Interface: ASP.NET with AJAX

• Code Behind: VC#.NET

MODULES:

• Administration

• Users(Students, Staff)

• Public Users

• Documents

• Reports

• Authentication

HARDWARE REQUIREMENTS:

Number Description

1 PC with 2 GB hard-circle and 256 MB RAM

SOFTWARE

1 Windows 2000/XP/or Higher with MS-office

2. MS-SQL server2000/2005

3. Ms-Visual Studio .Net 2005

4. Ms-Internet Explorer

• Manpower prerequisites:

3 to 4 Developers can finish this in 3-4 months.

Points of reference:

No. Milestone Name Milestone Description

Comments

1 Requirements Specification Complete particular of the framework including characterizing chains of command constitutes this point of reference. A report itemizing the same ought to be composed and an introduction on that be made. Attempt ought to be made to include some more pertinent usefulness other than those that are recorded in this archive.

2 Technology familiarization Understanding of the innovation expected to actualize the undertaking. The introduction ought to be from the perspective of having the capacity to apply it to the undertaking, as opposed to from a hypothetical point of view.

3

Database creation

A database of no less than 10 sections of clients with no less than 1 should application administrator.

t is critical to settle on the database at this stage itself so advancement and testing can continue with the genuine database itself.

4 High-level and Detailed Design Listing down every single conceivable situation and after that surfacing with stream diagrams or pseudo code to deal with the scenario. The situations should guide to the prerequisite determination

5 Development of front end functionalities. Usage of the fundamental screen giving the login, screen that takes after the login giving different choices, screens for every one of the alternatives During this turning point period, it would be a smart thought for the group to begin dealing with a test-anticipate the whole framework. This test-plan can be refreshed as and when new situations ring a bell.

6 Integrating the front-end with the database The front-end created in the before a point of reference will now have the capacity to refresh the database. Different highlights ought to be practical at this stage. To put it plainly, the framework ought to be prepared for reconciliation testing.

7 Integration Testing The framework ought to be altogether tried by running all the experiments composed for the framework (from turning point 5). Another 2 weeks ought to be there to deal with any issues found amid testing of the framework. From that point forward, the last demo can be organized.

8 Final Review Issues found amid the past point of reference are settled and the framework is prepared for the last review. During the last audit of the venture, it ought to be watched that every one of the prerequisites determined amid development number 1 are satisfied

The accompanying advances will be useful to begin off the venture:

• Study and be OK with advances, for example, ASP.Net with C#, and SQL Server.

• Gather some learning of item chains of importance and support before beginning the outline.

• Create a client database with various access levels.

• Start with making the login screen.

• Create menus for route and gathering the functionalities as sub menus.

• Create the assistance pages of the application as FAQ. This will helps a client.

Leave a Reply

Your email address will not be published. Required fields are marked *