.NET MINI PROJECTS

ASP Project On Project Scheduler

ASP Project On Project Scheduler

ABSTRACT:

Task Scheduler is a basic, quick, exact and simple to use with adaptable alternatives for review the basic points of interest. The arrangement is most appropriate for people taking a shot at different activities, which monitors every one of the Projects and their Schedules.

Undertaking Scheduler likewise causes you to back and reestablish your work in a record with the goal that you can simply have a reinforcement document to be reestablished to the application just on the off chance that you lose your information coincidentally. You can add any number of calendars to be improved the situation each current ventures utilizing the Project scheduler. In This framework, each calendar can be followed from the begin till the finish of the Project cycle. You can track the underneath points of interest for each calendar:

• Project for whom the timetable is to be finished,

• You’re Rate/Hour for this specific work to be finished.

• Start and End date of the task.

• Total working hours of a day (balanced with the break time alternative).

• Current status and Percentage of work finished (Progress Bar).

• Payment sum pending from the task (Out of Scope)

EXISTING SYSTEM:

 Cannot Upload and Download the most recent updates.

 No utilization of Web Services and Remoting.

 Risk of blunder and of information when the venture is being worked on.

 Less Security.

 No legitimate coordination between various Applications and Users.

 Fewer Users – Friendly.

PROPOSED SYSTEM:

The improvement of the new framework contains the accompanying exercises, which attempt to mechanize the whole procedure keeping in perspective of the database coordination approach.

 User amicability is given in the application different controls.

 The framework makes the general undertaking administration considerably simpler and adaptable.

 Readily transfer the most recent updates, enables the client to download the alarms by tapping the URL.

 There is no danger of information blunder at any level while the venture improvement is under process.

 It furnishes abnormal state of security with various level of validation.

Modules in the task are:

1. Project List

2. Time Period (begin date and date of consummation)

3. Rate/Hours

4. Project Status

5. Backup and Restore

1. Project List:

Finish List of the venture ought to include the association and the assignment ought to include the rundown by an administrator.

2. Time Period:

Here Admin will include all the venture timings from when the task has begun and when it needs to finish and the customer to them will give this time. In light of the planning, he will dole out the assignment to the worker.

3. Rate/Hours:

Here Admin will choose every one of the charges for the undertaking and he will appoint the hours for the venture in the middle of the representative in how long what assignment to be finished and what errand to be finished.

4. Project status:

Undertaking Status is chosen in view of the understudy and what the errand they have done in the venture is and day by day representative needs to give the status of the task which was given to them by the higher specialist.

5. Backup and Restore

Here Admin needs to go down and reestablish the whole undertaking and the Database in the association and he needs to give the way of the things where he has kept.

Practical parts of the undertaking:

• Track your various activities.

• The Project rundown can be tweaked to list current Projects, completed Projects or every one of the ventures to stays up with the latest with the undertaking status in advance bar.

• Check out your Project Status.

• Plan and calendar your ventures successfully.

• Store Completed or Active ventures Tasks can be particular to an undertaking.

• A detailed perspective of individual undertakings.

• Track the status of each undertaking.

Watchwords:

• Generic Technology watchwords: Databases, User Interface, Programming

• Specific Technology watchwords: ASP.Net, C#.Net, MS SQL Server

• Project write watchwords: Analysis, Design, Implementation, Testing

Condition:

• Servers:

• Operating System Server: – Microsoft Windows 2000 or Higher

• Data Base Server: Microsoft SQL Server 2000/2005

• Clients: Microsoft Internet Explorer,

• Tools: Microsoft Visual Studio.Net

• User Interface: ASP.NET with AJAX

• Code Behind: VC#.NET

Necessities:

• HARDWARE REQUIREMENT:

Number Description

1 PC with 2 GB hard-plate

what’s more, 256 MB RAM

SOFTWARE REQUIREMENT:

Number Description

1 Windows CE.

2. MS-SQL server CE

3. Ms-Visual Studio.Net 2005

4. Mobile Browser.

The accompanying advances will be useful to begin off the venture:

• Study and be alright with advancements, for example, ASP.Net with C#, and SQL Server.

• Gather some information of related innovation and support before beginning the outline.

• Create a client database with various access levels.

• Start with making the login screen.

• Create menus for route and gathering the functionalities as sub menus.

• Create the assistance pages of the application as FAQ. This will helps a client.

DOWNLOAD: -Project Scheduler

Leave a Reply

Your email address will not be published. Required fields are marked *